Art Handling Manual: Difference between revisions
Lmarlborough (talk | contribs) No edit summary |
Lmarlborough (talk | contribs) No edit summary |
||
| Line 7: | Line 7: | ||
== Categories: == | == Categories: == | ||
=== [[Category 1: | === [[Category 1: The Team]] === | ||
This opening category | This opening category include history of the department, current job descriptions, organisation chart and then profile of staff; past and present | ||
=== [[Category 2: Department Statements]] === | === [[Category 2: Department Statements]] === | ||
Revision as of 09:09, 8 April 2020
Introduction
To be rewritten ...
Categories:
Category 1: The Team
This opening category include history of the department, current job descriptions, organisation chart and then profile of staff; past and present
Category 2: Department Statements
This category contains a Mission Statement from the Head of Department and information on the nature of the Team. The intention here is to illustrate a typical day in the life of the team. This category also includes a brief history of the Department.
Category 3: Recruitment
This category describes the current departmental structure and also contains all the current job descriptions for each team role. The category also contains an outline of the qualities we look for when recruiting new technicians as well as an example of the background and experience of some of our technicians. The Induction Program used to train new members to the Department is also included.
Category 4: Installation & Preparation
This category involves written explanations of the procedures we adopt in the transportation/handling and de/installation of the Gallery Collection. Further information on equipment or more complicated technical issues are held elsewhere in the manual.
Category 5: Admin Working Procedures
This category describes the function of the office and the administration procedures for all the Departments activities.
Category 6: Complicated Installations
This category describes the de/installations that require special methods or particular pieces of equipment. There is also a description of the categorisation method adopted by the Department as well as an example of the document used to list further issues for each picture.
Category 7: Equipment
This category focuses on the design work undertaken by the Department to produce bespoke equipment ideal to our needs. The category describes the design approach taken and illustrates some of the results of these efforts.
Category 8: Operating Procedures
This category includes copies of the “safe systems of work” documents that it has been necessary to write with regards the equipment designed by the Department.
Category 9: Exhibitions
This category describes our role in the Gallery’s Temporary Exhibition program. It includes our procedures when working with couriers and our relationship to the other relevant departments.
Category 10: Casing
This category refers to our arrangements for preparing Collection works to go on loan. The category also deals with our approach to casing, the contractors we use and possible future developments.
Category 11: Health & Safety:
This category deals with the relevant legislation applying to the Department, examples of documentation such as risk assessments and our training responsibilities. The category also gives a summary of the changes in our working practices as a direct result of Health and Safety Legislation.
Category 12: Emergency planning and salvage
Most of the relevant information for this category can be found in more detail in the Galleries Disaster Control Plan. This category therefore, deals with the efforts the Department have made to improve our arrangements and the role of individual technicians under emergency measures.